TM 9-2320-279-34-1
Axles No. 1 and No. 2 Maintenance Instructions (Cont)
9-14. AXLES NO. 1 AND NO. 2 BALL, BUSHING, AND OIL SEAL REMOVAL/INSTALLATION.
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
References
All
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
Para 9-13
Ball socket removed.
None
Special Environmental Conditions
Supplies
None
Adhesive-sealant, silicone, Item 6, Appendix C
Solvent, dry cleaning, Item 57, Appendix C
General Safety Instructions
None
Personnel Required
MOS 63W, Wheel vehicle repairer
Level of Maintenance
Direct Support
a. Removal.
NOTE
Ball, bushing, and oil seal removal is the same for both sides of axles No. 1 and
No. 2. Left side of axle No. 1 is shown.
(1) Remove four screws (1) and lockwashers (2) from bottom holes of ball and bushing assembly (3).
9-94