TM 9-2320-279-20-3
Change 5
25-151
M978 Tanker Maintenance Instructions (Cont)
e. Installation.
(1)
Position flow limiting valve (4)
against bracket (3) on grating (5).
(2)
Install flow limiting valve (4)
with U-bolt (2) and two
locknuts (1).
f.
Follow-on Maintenance.
(1)
Install V5 air actuated flow valve
(para 25-19).
(2)
Install flow limiting valve to
filter-separator piping (para 25-11).
(3)
Install filter-separator (para 23-4).
(4)
Install V18 BULK DELIVERY
VALVE (para 25-31).
(5)
Perform unfiltered bulk unloading
(TM 9-2320-279-10).
(6)
Check flow limiting valve for leaks.
END OF TASK