(6)
(7)
(8)
(9)
(10)
(11)
TM 9-2320-279-20-3
M978 Tanker Maintenance Instructions (Cont)
Position pipe (15) between
pipes (16 and 17).
Position coupling
gasket (14) so that ends of
pipes (15 and 16) are
covered.
Position coupling
gasket (13) so that ends of
pipes (15 and 17) are
covered.
Install two coupling
halves (18) with two
screws (19) and nuts (20).
Install two coupling
halves (21) with two
screws (22) and nuts (23).
Install U-bolt (24) in
bracket (25) with two
locknuts (26).
c. Follow-on Maintenance.
(1)
(2)
(3)
(4)
(5)
(6)
Install filter-separator
(para 23-4).
Start engine and build up
air supply
(TM 9-2320-279-10).
Inspect V5 air actuated flow
valve for leaks and proper
operation.
Perform unfiltered bulk
unloading
(TM 9-2320-279-10).
Install pump module right
side access panel (para 16-48).
Pump module top access door closed (TM 9-2320-279-10).
END OF TASK
25-95