TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
(2)
(3)
(4)
(5)
(6)
Put cable (1) through
slot (3) and cable guide (4)
in drum (5).
Make loop in cable (1)
approximately 6 in.
(152 mm) from cable end.
Install wedge (6) in cable
loop. Push free end of cable
back through guide (4).
Pull free end of cable (1) to
seat cable loop and wedge (6)
in slot of drum (5).
Lubricate cable (1) with
lubricating oil.
Soldier A operates winch
and winds cable (1) on drum
evenly while Soldier B
maintains tension on
cable (1).
c. Follow-on Maintenance.
(1) Install crane hook block,
hook, and clevis (M985)
(para 17-15).
(2) Install crane hook block and hook (M977) (para 17-17).
(3) Install crane hook block, hook, and clevis (M984E1) (para 17-17.1).
END OF TASK
17-19. CRANE HOIST SHEAVE PULLEY REMOVAL/REPAIR/INSTALLATION (M983).
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning/Inspection
f. Follow-on Maintenance
INITIAL SETUP
Models
References
M983
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description.
Special Tools
TM 9-2320-279-10 Prepare crane for use with
None
manual controls.
Supplies
TM 9-2320-279-10 End of boom lowered to
Grease, automotive and artillery, Item 23,
working level, hook block on
Appendix C
ground.
Solvent, dry cleaning, Item 47, Appendix C
Special Environmental Conditions
Personnel Required
None
MOS 63S, Heavy wheel vehicle mechanic
General Safety Instructions
Wear heavy gloves when handling cable.
17-91
