TM 9-2320-279-20-2
Brake and Air System Maintenance Instructions (Cont)
(7)
Connect eight air lines (18), two air lines (19), and air line (20) to No. 4 air manifold (5).
(8)
Connect two electrical leads (21) to pressure switch (4) with washers (22) and nuts (23).
NOTE
Install plastic cable ties as needed to secure air lines.
c.
Follow-on Maintenance.
(1)
Connect batteries (para 7-91).
(2)
Start engine and build up air pressure (TM 9-2320-279-10).
(3)
Check air connections for leaks.
(4)
Shut off engine (TM 9-2320-279-10).
END OF TASK
Change 2
11-109