TM 9-2320-279-20-2
Brake and Air System Maintenance Instructions (Cont)
11-28.
NO. 4 AIR MANIFOLD REMOVAL/INSTALLATION (CONT).
(5) Install No. 4 air manifold (5) on
bulkhead (12) with four screws (13) and
lockwashers (14).
(6) Connect seven air lines (15), two air
lines (16), and two air lines (17) on No. 4
air manifold (5).
11-108