TM 9-2320-279-10-1
E-18
Change 7
Preparation for Transport and Operation (Cont)
E-7. POSITION MANHOLE COVER FOR TRANSPORT/OPERATION (CONT).
NOTE
Perform step (3.1) for Model B.
(3)
Remove manhole cover (4) and gasket (5).
(3.1)
Remove plate (4.1) and gasket (5).
(4)
Install gasket (5).
(5)
Turn Model A manhole cover
(4) over and position Model
A or Model B cover (4) on
tanker.
(6)
Install clamp (3) on manhole cover (4).
(7)
Install screw (2) and nut (1).