TM 9-2320-279-10-1
Preparation for Transport and Operation (Cont)
E-6. REMOVE/INSTALL VENT ROLLOVER RAILS (CONT).
(4)
(5)
(6)
Position vent rollover rail (8) on tanker with notched edge (9) by
manhole cover (3).
Slide other edge of vent rollover rail (8) under retainers
Aline holes and install two screws (11) and washers (12).
(10).
E-14
Change 5