TM 5-5420-234-14&P
2-16. HIGH-BANK BRIDGE BAY LAUNCH (continued).
(2)
Secure winch frame to LHS hook arm assembly.
Make sure two winch frame locking levers (2) are in
the down position. If locking levers are not down:
(a)
Remove lockpin (3) from locking
lever (2).
(b)
Swing locking lever (2) to the
down position.
(c)
Insert lockpin (3) into locking
2
lever (2).
(3)
Connect two winch hydraulic pressure hoses (4) to
male connector and female connector (5) located on
3
bottom of hook arm assembly.
4
4
5
5
6
(4)
Back up Transporter perpendicular to bank and
centered with bridge bay, stopping about 10 feet
(3 m) away from bridge bay.
(5)
Apply parking brake and place transmission in
neutral.
(6)
Set curb-side and road-side rear guides (6) in the
disengage position:
(a)
Rotate latch pin (7) until
rear guide (6) disengages.
8
(b)
Swing rear guide (6) to
7
fully open position, and
make sure latch pin (7)
clicks pin in hole (8) in rear
guide (6).
2-86