TM 5-5420-234-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS)
Item To
Item
Not Fully Mission
Check/
No.
Interval
Procedure
Capable If:
Service
NOTE
Perform HEMTT PMCS before
performing PMCS for the LHS
and the BAP. (Refer to TM 9-
2320-279-10.)
WARNING
Check for overhead power lines or
other obstructions before attempt-
ing operation of the LHS. The
LHS reaches a height of 22 feet,
two inches (6.7 m). Serious in-
jury or death could result from
contact with electric power lines.
1
Before
Load Handling
a. Check for proper operation of LHS
a. LHS will not operate.
System (LHS)
MODE SELECT switch (1) and joystick
Controls
(2). Verify by placing LHS MODE
SELECT switch (1) in AUTO position.
aa. MODEL B ONLY. Place PTO
ENGAGE switch (5) in ON position. Ensure
indicator light (6) comes on.
4
1
2
3
MODEL A SHOWN
PTO ENGAGE
6
5
OFF
ON
Change 1