TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance Instructions (Cont)
(3) Remove four screws (6), solenoid (7), and preformed packing (8).
NOTE
Spool may be up in shift block. Pull handle to release spool.
(4) Remove spool (9) from block (10).
b. Installation.
NOTE
All solenoids are installed the same
way.
(1) Install spool (1) in block (2).
(2) Install preformed packing (3) and
solenoid (4) with four screws (5).
(3) Install seal (6), connector (7), and
screw (8).
(4) Aline and install cover (9) with four
screws (10).
c. Follow-on Maintenance. None.
END OF TASK
17-139