TM 9-2320-279-34-3
Special Purpose Kit Installation Instructions (Cont)
23-11. ENGINE, PREPARATION FOR SHIPPING AND STORAGE CONTAINER (CONT).
NOTE
Note position of air lines.
b.
(19) Disconnect hose (31) and
remove from old engine and
install on new engine.
(20) Disconnect hose (32) from old
engine and install on new
engine.
(21)
(22)
(23)
(24)
(25)
Remove screw (33), lockwasher (34), and loosen screw (35).
NOTE
Install screw and lockwasher after removing fitting.
Remove plug (36) from new engine.
Remove hose (37), elbow (38), adapter (39), and fitting (40).
Install plug (36) in old engine.
Apply compound and install fitting (40), adapter (39), and elbow (38) on new engine.
Follow-on Maintenance.
(1) Install fan (TM 9-2320-279-20).
(2) Install steering pump on replacement engine (para 12-10).
(3) Install air compressor governor on replacement engine (TM 9-2320-279-20).
(4) Install throttle control solenoid on replacement engine (Para 12-8).
(5) Install ether sensing unit on replacement engine (TM 9-2320-279-20).
(6) Install tachometer sending unit on replacement engine (TM 9-2320-279-20).
(7) Install starter relay on replacement engine (TM 9-2320-279-20).
(8) Install engine wiring harness on replacement engine (para 6-6).
(9) Install replacement engine in vehicle (para 3-3).
(10) Install engine in shipping and stowage container (para 23-9).
END OF TASK
23-78
