TM 9-2320-279-34-3
Power Takeoff (PTO) and Hydraulic Pump Maintenance Instructions (Cont)
19-2.1. POWER TAKEOFF REPAIR (M984E1) (CONT).
(14)
(15)
(16)
(17)
Apply thin coat of grease to mounting surface of PTO (22).
NOTE
Aline matchmarks on closed-end bearing cover and PTO before installing.
Install gasket (23) and closed-end bearing cover (21) and output shaft assembly (3) to PTO (22)
with four screws (24). Tighten screws to 15 to 20 lb-ft (20 to 23
Install oil seal (25) in pump housing
assembly (26).
Apply thin coat of grease to mounting surface
of PTO (22).
NOTE
Aline matchmarks on pump housing assembly
and PTO before installing.
(18) Install gasket (27) and pump housing
assembly (26) with four screws (28). Tighten
screws to 17 to 20 lb-ft (23.0 to 27.1 N m).
19-12.8