TM 9-2320-279-34-2
Frame Maintenance Instructions (Cont)
(2) Soldier A installs four screws (7) while
Soldier B installs two spacers (4), two
spacers (8), and four nuts (6).
(3) Soldier A installs screw (7) while Soldier B
installs nut (6).
c. Follow-on Maintenance.
(1) Install outrigger (para 17-35).
(2) Install crane (para 17-3).
(3) Install winch cable guide (TM 9-2320-279-20).
(4) Install taillights (TM 9-2320-279-20).
END OF TASK
13-28. CRANE MOUNTING SUPPORTS REMOVAL/INSTALLATION (M983).
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
Equipment Condition
9
8
3
TM or Para
Condition Description
Test Equipment
Para 18-2
Crane removed.
None
TM 9-2320-279-20 Fuel tank removed.
Special Tools
TM 9-2320-279-20 Battery box removed.
None
Special Environmental Conditions
Supplies
None
None
General Safety Instruct ions
None
Personnel Required
MOS 63W, Wheel vehicle repairer
Level of Maintenance
References
Direct Support
None
13-83