TM 9-2320-279-20-3
CHAPTER 26
CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR)
EQUIPMENT MAINTENANCE
Contents
Para Page
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26-1
26-1
M-8 Chemical Alarm Kit Removal/Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26-2
26-1
M-13 Decontamination Unit Removal/Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26-3
26-11
Gas Particulate Filter Unit (GPFU) Removal/Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26-4 26-14
Section I.
INTRODUCTION
26-1. GENERAL. This chapter contains maintenance instructions for removing and installing chemical,
biological, and radiological (CBR) components authorized by the Maintenance Allocation Chart (MAC) at
the organizational maintenance level.
Section Il. CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR) EQUIPMENT
Chemical, Biological, and Radiological (CBR) Equipment Maintenance Instructions
26-2. M-8 CHEMICAL ALARM KIT REMOVAL/INSTALLATION.
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
All
Test Equipment
None
Special Tools
None
Supplies
Tags, identification, Item 48, Appendix C
Personnel Required
MOS 63S, Heavy wheel vehicle mechanic
References
TM 3-6665-225-12
Equipment Condition
TM or Para
Condition Description
Para 7-91
Batteries disconnected.
Special Environmental Conditions
None
General Safety Instructions
None
26-1