TM 9-2320-279-20-3M978 Tanker Maintenance Instructions (Cont)(2)(3)(4)(5)Remove V12 bottom load PRECHECK VALVE (5)and pipe nipple (6).Remove tee (4) and pipe nipple (7) from V2 bottomload adapter (8).Remove adapter (9) from tee (4).Remove elbow (3) and pipe nipple (6) fromV12 bottom load PRECHECK VALVE (5).b. Installation.WARNINGAdhesives, solvents, and sealing compounds can burneasily, can give off harmful vapors, and are harmful toskin and clothing. To avoid injury or death, keep awayfrom open fire and use in well-ventilated area. Ifadhesive, solvent, or sealing compound gets on skin orclothing, wash immediately with soap and water.(1)(2)(3)(4)(5)Coat threads of elbow (1) with pipe thread sealingcompound and install in V12 bottom load PRECHECKVALVE (2).Coat threads of pipe nipple (3) with pipe threadsealing compound and install in V12 bottom loadPRECHECK VALVE (2).Install adapter (4) in tee (5).Coat threads of pipe nipple (6) with pipe threadsealing compound and install pipe nipple and tee (5)in V2 bottom load adapter (7).Coat threads of pipe nipple (3) with pipe threadsealing compound and install in tee (5).25 - 123
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business