TM 9-2320-279-20-3
Pipe
No.
10
11
12
13
14
15
16
17
18
M978 Tanker Maintenance Instructions (Cont)
Table 25-2. Tanker Piping (Cont)
From
V6 FUEL/DEFUEL
CONTROL VALVE (M)
ED EDUCTOR (N)
V9 CHECK VALVE (O)
V6 FUEL/DEFUEL
CONTROL VALVE (M)
Flow Meter (Q)
VT VENTURI
Assembly (R)
V7 REEL VALVE (T)
VR Vapor Recovery
Piping (V)
V2 Bottom Load
Adapter (W)/V12
Bottom Load
PRECHECK VALVE (X)
To
ED EDUCTOR (N)
V9 CHECK VALVE (O)
Tank (Not Shown,
Removed for Clarity)
AE AIR
ELIMINATOR/Strainer
Assembly (P)
VT VENTURI
Assembly (R)/V11
FLOW VALVE
(REG) (S)
V7, V8 REEL
VALVES (T)(U)
H1 REEL (Not Shown,
Removed for Clarity)
V2 Bottom Load
Valve (Y)
Refer
To
Figure
25-6
25-6
25-6
25-6
25-6
25-6
25-6
25-6
25-6
Equipment
Condition
TM Or Para
Para 25-23
Para 25-25
Para 25-30
Para 23-4
Para 23-4
Para 25-16
Para 25-26
Condition Description
V9 CHECK VALVE to
Air Eliminator Piping
Removed
V11 FLOW VALVE
(REG) Removed
V17 GRAVITY VALVE
Removed
Filter-Separator
Removed
Filter-Separator
Removed
V2 Bottom Load
Adapter Removed
V12 Bottom Load
PRECHECK VALVE
Removed
25-55