TM 9-2320-279-20-2
(3)
(4)
(5)
(6)
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
Install two bearings (6) in roller (7).
Install roller (7).
Install bracket (8) with screw (9) and locknut (10).
Install cotter pin (11).
(7) Install pivot assembly (12), washer (13), and
cotter pin (14).
17-45