TM 9-2320-279-20-2
(7)
(8)
(9)
(10)
(11)
Winches, Cranes, and Power Takeoff (PTO) Maintenance
Install pivot assembly (13), washer (14),
and cotter pin (15).
Install two bearings (16) in roller (17).
Install spacer (18), roller (17), and
washer (19).
Install S-bracket (20) with screw (21) and
locknut (22).
Install cotter pin (23).
Instructions (Cont)
17-21