TM 9-2320-279-20-2
(1)
(2)
(3)
(4)
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
d. Installation.
Install two spacers (1) and
bracket (2) with two
screws (3) and nuts (4).
Soldier A installs cable
tensioner (5) with two
screws (6) while Soldier B
installs two nuts (7). Do not
tighten nuts or screws.
Soldier A installs two
screws (8 and 9) while
Soldier B installs nuts (10
and 11).
Tighten screws (6) and
nuts (7).
e. Follow-on Maintenance.
(1) Lubricate front cable
tensioner
(LO 9-2320-279-12).
(2) Install splash guard
(para 16-13).
END OF TASK
17-13