TM 9-2320-279-20-2
Cab and Body Maintenance Instructions (Cont)
NOTE
Left and right tow spade holders are removed and installed the same way.
c. Tow Spade Holder Removal. Soldier A removes four screws (1) and tow spade holder (2) from
wrecker body floor (3) while Soldier B removes nuts (4).
d. Tow Spade Holder lnstallation. Soldier A installs tow spade holder (2) on wrecker body
floor (3) with four screws (1) while Soldier B installs four nuts (4).
e. Follow-on Maintenance. Install retriever adapters and tow spades (TM 9-2320-279-10).
END OF TASK
16-63. 60-TON TACKLE BLOCK HOLDDOWN AND FRAME REMOVAL/INSTALLATION
(M984E1).
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
References
M984E1
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
TM 9-2320-279-10 60-Ton tackle block removed.
None
Special Environmental Conditions
Supplies
None
None
General Safety Instructions
Personnel Required
None
MOS 63S, Heavy wheel vehicle mechanic
16-224
