(1)
(2)
(3)
(4)
TM 9-2320-279-20-2
Frame and Tire Carrier Maintenance Instructions (Cont)
a. Removal.
Soldier A removes two
screws (1) while Soldier B
holds and removes two
nuts (2).
Support generator
mount (3) with suitable
lifting device.
Soldier A removes three
screws (4) while Soldier B
holds and removes three
nuts (5).
Soldier A operates lifting
device while Soldier B
guides and removes
generator mount (3) from
frame (6).
b. Installation.
(1) Soldier A operates lifting
device while Soldier B
positions generator
mount (3) on frame (6) and
aligns holes.
(2) Soldier A installs three
screws (4) while Soldier B holds and installs three nuts (5).
(3) Soldier A installs two screws (1) while Soldier B holds and installs two nuts (2).
c. Follow-on Maintenance.
(1) Install tire davit shock mount (para 15-4).
(2) Install axle No. 2 left shock absorber mount (para 15-3).
(3) Install fuel tank and front bracket (para 4-7),
(4) Install rear catwalk mount (para 14-13).
(5) Install right side and rear catwalk (para 14-12).
(6) Install generator set (para 27-2).
(7) Install outrigger pad stowage box (para 16-35).
(8) Install battery box (para 7-92).
(9) Install left rear splash guard (para 16-13).
END OF TASK
14-25