TM 9-2320-279-10-1
APPENDIX E
PREPARATION FOR TRANSPORT AND OPERATION
Section I. INTRODUCTION
E-1. SCOPE. This appendix lists tasks which are to be done by the
operator/crew of a vehicle in preparation for movement by ship, train, or
aircraft, and tasks which must be done to prepare the vehicle for operation.
E-2.
GENERAL. Tasks to be done to prepare vehicle for transport and for
operation are divided into the following sections:
a. Section II. preparation for transport Task List. This table lists
tasks to be done before transporting vehicle.
b. Section III. Preparation for Operation Task List. This table lists
tasks to be done after transport before operating vehicle.
E-3. EXPLANATION OF COLUMNS.
a .
Model. This is the vehicle model to which tasks listed in the second
column apply.
b .
Task. This column describes the task to be completed.
c.
Reference/Paragraph. The paragraph reference given is for the
procedure in this manual to be used to perform the listed task. If no reference
exists elsewhere in this manual, the task procedure is given in a paragraph of this
appendix. The removal and installation procedures for the vent rollover rails, for
example. are not written elsewhere in this manual, but are given in paragraph
E-6.
Contents
Position Side Mirrors for Transport...... . . . . . . ....... . . . . . . . . . . . . . . . . .............
Position Side Mirrors for Operation............................................................
Remove Pump Module Handrail............................................................
Install Pump Module Handrail.............................................................. .
Remove Vent Rollover Rails................................................................ .. .. .
Install Vent Rollover Rails.................................................................. . ... . .
Position Manhole Cover for Transport................................................. .
Position Manhole Cover for Operation.......................................................
RemoveVentHood..................................................................................
InstallVentHood.....................................................................................
Para
Page
E-4.a.
E-3
E-4.b. E-3
E-5.a.
E-4
E-5.b. E-8
E-6.a.
E-12
E-6.b.
E-13
E-7.a.
E-15
E-7.b.
E-17
E-8.a.
E-19
E-8.b. E-20
E-l