TM 5-5420-234-14&P
4-48.
WORKSTATION ASSEMBLY REPLACEMENT (continued).
(6) With the help of an assistant, position workstation rail (4) on fender (8).
(7) Install two screws (7) and new locknuts (6) in workstation rail (4) and fender (8).
(8) Install two screws (3), washers (2), and new locknuts (1) in workstation rail (4) and tire davit panel (5).
3
4
2
1
7
5
~
8
6
c. Follow-on Maintenance:
Remove wheel chocks (TM 9-2320-279-10).
END OF TASK
4-522
4