(8)
(9)
(10)
(11)
(12)
(13)
TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance Instructions (Cont)
Aline and install preformed packing (22),
cap (23) with four screws (24) on valve (18).
Install seal washer (25) and screw (26).
Install two preformed packings (27) and three
preformed packings (28) in directional
valve (18).
Install valve (18) with four screws (29) and
caps (30).
Install six preformed packings (31) and
fittings (32).
Install two preformed packings (33) and fittings (34)
in valve body (6).
17-138.5