TM 9-2320-279-20-3
Manufactured Items (Cont)
Table F-15. M1977-CBT Components
The maintenance tasks and Maintenance Allocation Chart (MAC) group listed below contain
specific information about the M1977-CBT (Common Bridge Transport).
TITLE
PARAGRAPH/APPENDIX
Muffler Assembly Removal/Installation
5-2
Side Panel Switches Removal/Installation
7-39
Battery Box and NATO Connector Removal/Repair/Installation
7-92
Self-Guided Coupler Removal/Repair/Installation (M1977-CBT Only)
14-15.1.1
Tire Carrier Removal/Installation
14-16
Left Front Fender Removal/Installation
16-14
Right Front Fender Removal/Installation
16-15
Stowage Box Removal/Installation (M977, M985, M1977-CBT)
16-33
Front Cable Guide Removal/Repair/Installation
17-4
Mirror Extension Assembly Removal/Installation
18-11.1
(M98E1 and M1977-CBT Only)
Hydraulic Relief Valve Removal/Repair/Installation
19-4
Flow Priority Valve Removal/Installation
19-5
Maintenance Allocation Chart (Group No. 1503)
Appendix B
Change 3
F-33/(F-34 blank)