TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO)
d. Assembly.
(1)
(2)
(3)
(4)
(5)
Install wiring harness (1) in remote control
box (2).
Install connector (3) with lockwasher (4)
and nut (5).
Install cap and chain (6) on connector (3)
and secure to remote control box (2) with
lockwasher (7) and screw (8).
Install three wires (9) on power
switch (10) with three screws (11) and
lockwashers (12),
Install power switch (10) in remote
control box (2) with switch boot (13).
Maintenance Instructions (Cont)
17-107