TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-31. CRANE LEFT AND RIGHT OUTRIGGER CONTROL LEVERS REMOVAL/INSTALLATION
(M983) (CONT).
b. Right Side Outrigger Controls Installation.
NOTE
Both right outrigger controls are installed the same way.
(1) Install sleeve (1) in knob (2).
(2) Install knob (2) on lever (3).
(3) Install lever (3) in coupling (4).
(4) Install pin (5) in coupling (4) and lever (3).
17-154